JOB REFERENCES

EWARDS AFB, CA - REPAIR FIRE SYSTEMS DEFICIENCIES PROJECT

Contract Number: W912PL-09-D-0043, Task Order 0002

Contract Progress: 80%

Contract Value: $1, 963,394.00

Summary:
Edwards AFB, located in the Mojave Desert 100 miles north of Los Angeles has been the premier Flight Test Center for over sixty years. Every modern fighter, bomber, transport aircraft and un-manned aircraft in the USAF inventory has been tested here at one time. Additionally, NASA performs various aeronautical testing here and uses the 15,000 foot concrete runway as back-up landing for the shuttle. Alpine Diversified, Inc. is tasked to upgrade and install new Fire Alarm and Fire Suppression systems at various buildings and hangers supporting these EAFB missions. Our qualified Team of engineers and technical support personnel have installed and successfully tested a complete fire alarm system in one of the largest complexes on the Base. Performing most of the work at night, thousands of feet of conduit and wire were placed throughout this facility to minimize the disturbance to the occupants. Testing of the entire fire alarm system was accomplished during one Saturday with the EAFB Fire Department signing the NFPA Form 74 that same afternoon!

At other EAFB administrative facilities and hangers Alpine Diversified, Inc’s Team has installed and tested complete wet Fire Suppression Systems. In three hangers that support F-22 missions 24/7, our Specialty Team of AFFF (Foam Fire Suppression) Techs worked closely with the Facility Manager to ensure there were no disruptions to critical flight operations during the testing of Foam Fire Suppression systems.
Scheduling is an important factor when working real-time mission support at Edwards AFB and Alpine Diversified, Inc. has stepped up to the challenge. We are currently planning the final phases for this multi-faceted project and anticipate completion in the fall of 2011.

Fire Systems Fire Systems Fire Systems Fire Systems

 

EDWARDS AFB, CA - WATERLINES PROJECT

Contract Number: W912PL-10-D-0055, Task Order 0001, MC Waterline AFRL

Customer: USACE, Los Angeles Area, Palmdale Division, EAFB Resident Office, Jackie Abbott USACE Representative

Contract Progress: 100%

Contract Value: $654,478.00

Summary:
Alpine Diversified, Inc. tasked to combine three separate waterlines, run over 5,000 feet of C-900 6 and 8 inch PVC pipe add appropriate check valves, gate valves, fittings and wet taps all to provide sufficient volume and pressure to an existing Fire Suppression System in a solid rocket motor propellant facility was a daunting endeavor. Combine this with some of the most remote desert area at the Edwards AFB Rocket Lab also known as the “Rock” and you have a project that showcased our Team’s Talent to get it done! Crucial to this project was to ensure all Team Members security clearances were obtained and each person properly trained before starting work at this high security facility. Training of our workforce by both Alpine Diversified, Inc. and the USAF Rocket Lab Safety personnel were scheduled at mobilization of the project. This maintained our customer’s requirement to get ahead of other projects that overlapped in our work zone. Combining Alpine’s administrative strength with our performance proven sub-contractors our Team provided the customer with more than what was asked – project complete 3 months ahead of schedule!

Some of the unique hazards our group encountered while trenching and laying pipe for this task: crossing a railroad spur and roadway, high pressure natural gas and high pressure (6,000 psi) nitrogen lines as well as fractured granite found during most of the trenching (hence the Rock designation). All hazards were approached by Alpine’s Team with a zero incident or accident frame of mind. Activity Hazard Analysis were prepared and discussed with every team member before each new project task was started.
Safety is always the number 1 consideration for Alpine Diversified, Inc. in all of our projects and we completed this task without any accident or incident.

Waterlines Waterlines Waterlines Waterlines

 

EDWARDS AFB, CA - HVAC PROJECT

Contract Number: W912PL-09-D-0043, Task Order 0001, RPR HVAC Building 2660

Contract Progress: 100%

Contract Value: $921,499.00

Summary:
The Edwards AFB Theater built around 1956 has been a central part of EAFB History. Current movies have been shown for the enjoyment of active service personnel and their families living at this remote desert location. Briefings are held there occasionally to base staff members and award ceremonies use the theater’s capability to seat 600 people. State of the art movie projection and sound systems are employed. The air conditioning and air handling systems however were still the same systems that were installed in 1956!
Alpine Diversified, Inc.’s task to upgrade the EAFB Theater Heating, Ventilation and Air Conditioning (HVAC) systems to more efficient (i.e. less power consumption) and use Ice Bank Technology to store energy for non-peak use at the Theater and 2 other buildings was not previously done at this high desert AF Base.  Envisioned by our customer was placing new HVAC systems to accommodate Title 24 requirements. Alpine Diversified, Inc. added value to the Base Theater Project by supplying the electrical engineering analysis that showed an upgrade to the existing electrical systems was in order. A 225kVA transformer using environmental friendly cooling oil was strategically placed. An external 440 Volt switch panel was also added by Alpine to compliment the new air handling system requirements.

Key to the success of this project was the scheduling of the removal of asbestos pipe lagging, the old HVAC systems, the installation of new electrical service, the installation of the new ICE Bank, associated piping and the installation of new air handler and chiller. Our customer demanded the Theater be back up and operating with the new system providing chilled air before a critical Commander’s Call Meeting just 60 days from breaking ground. Working closely with our Team Members we had the HVAC systems and the Ice Bank working ahead of the critical meeting. In fact temperature readings just hours prior to the scheduled meeting showed 48° chilled air was being distributed into the Theater – this in the middle of the summer. Mission Accomplished!

Team Alpine provided the qualified engineering, proven mechanical system providers and installation technicians, electricians and high voltage workers, the trenching laborers and soils experts to give the EAFB Theater new life and another 55 years of service.

EAFB Theater EAFB EAFB EAFB

 

US ARMY CORP OF ENGINEERS - BEST CONTRACT

Project: Army National Guard Armory, Pomona – Concrete Paving Parking Area
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $865,000.00
Value of Work Performed: 100%
Date of Completion: 12/28/2006

Project: Los Alamitos Joint Forces Training Base – Roll Up Door Installation Bldg. 920
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $33,082.00
Value of Work Performed: 100%
Date of Completion: 12/23/2006

Project: Army National Guard Armory – Quansi Hut Storage Room Demolition
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $23,900.00
Value of Work Performed: 100%
Date of Completion: 11/2006

Project: Los Alamitos Joint Forces Training Base – Warehouse Renovation Bldg. 202
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $57,222.00
Value of Work Performed: 100%
Date of Completion: 10/08/2007

 

Project: Manhattan Beach National Guard Armory – Repairs and Rehabilitation & Modification NO. 1
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $800,000.00 & $170,000.00
Value of Work Performed: 100%
Date of Completion: 09/2007

Project: Mesa College Armory Interior Paint Upgrade
Owner Representative: Daman Young
Contact Phone Number: 251-690-2680
Contract Amount: $366,000.00
Value of Work Performed: 100%
Date of Completion: 11/01/2006

Project: Apple Valley Armory – New Roof Installation / Interior/Exterior Paint Upgrade
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $464,150.00
Value of Work Performed: 100%
Date of Completion: 12/2006

Project: Los Alamitos Joint Forces Training Base – Heat Pump / Interior Paint Bldg 59 Upgrade
Owner Representative: Leo Hickman
Contact Phone Number: 251-441-5665
Contract Amount: $249,665.00
Value of Work Performed: 100%
Date of Completion: 3/21/2007

USACE - LOST ANGELES DISTRICT

Project: Los Alamitos – HVAC Installation Bldg. 286
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount: $26,720.00
Value of Work Performed: 100%
Date of Completion: 12/31/07

Project: Los Alamitos – Lift Station Bldg. 244
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount: $60,860.00
Value of Work Performed: 100%
Date of Completion: 12/31/07

Project: Los Alamitos – Re Roofing Project Bldg. #8
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount: $469,794.00
Value of Work Performed: 100%
Date of Completion: 03/31/08

Project: Los Alamitos – Lexington Paving
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount: $390884.00
Value of Work Performed: 100%
Date of Completion: 06/28/2008

Project: Los Alamitos – Electrical Bldg. #920
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount : $58,026.00
Value of Work Performed: 100%
Date of Completion: 08/04/2008

 

 

Project: Los Alamitos – AVCATT Bldg #286
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount: $182,045.00
Value of Work Performed: 100%
Date of Completion: 08/12/2008

Project: Los Alamitos – Renovations and Upgrades Bldg. #260
Owner Representative: Hoang Huynh
Contact Phone Number: 626-401-4020
Contract Amount: $227,372.00
Value of Work Performed: 100%
Date of Completion: 12/01/2009

Project: Los Alamitos Plumbing & Flooring Upgrade Bldg. 6
Owner Representative: Stan Fujimoto
Contact Phone Number: 626-401-4084
Contract Amount: $328,330.00
Value of Work Performed: 100%
Date of Completion: 4/20/09

Project: Rio De Flag Flood Control Project
Owner Representative: Robert Reynolds
Contact Phone Number: 602-316-3057
Contract Amount: $5,129,224.00
Value of Work Performed: 100% Complete to Date
Date of Completion: 8/31/08

Project: Camp Roberts Storage Building Construction
Owner Representative: Lt. Colonel Walter Goodwater
Contact Phone Number: 916-854-3206
Contract Amount: $698,321.00
Value of Work Performed: 100% Complete to Date
Date of Completion: 11/17/09

FARMERSVILLE HIGH SCHOOL

Project: Garry L. Meek Stadium All Weather Track
Owner Representative: Mangini & Associates, Inc.
Contact Phone Number: 559-627-0530
Contract Amount: $757,101.86
Value of Work Performed: 100%
Date of Completion: 11/09/2006

 

 
USACE - SACRAMENTO DISTRICT

Project: CAARNG Oroville Building Systems Replacement
Owner Representative: Moe Adams
Contact Phone Number: 916-261-9032
Contract Amount: $1,248,396.56
Value of Work Performed: 100%
Date of Completion: 2/17/10

 

 
STATE OF CALIFORNIA MILITARY DEPARTMENT

Project: Los Alamitos – Concrete Sewer Lid
Owner Representative: Capitan Keels
Contact Phone Number: 209-483-0220
Contract Amount: $9,750.00
Value of Work Performed: 100%
Date of Completion: 01/03/2008

Project: Los Alamitos – Roof Repair Bldg. #260
Owner Representative: Capitan Keels
Contact Phone Number: 209-483-2020
Contract Amount: $30.997.80
Value of Work Performed: 100%
Date of Completion: 08/11/2008

Project: Los Alamitos – Foam Roof Repair Bldg. #282
Owner Representative: Walter Sharp
Contact Phone Number: 562-795-2077
Contract Amount: $42,925.00
Value of Work Performed: 100%
Date of Completion: 08/12/2008

Project: Burbank – Asbestos Pipe-Wrapping Replacement
Owner Representative: Kingsley Vanduzer
Contact Phone Number: 562-594-1500
Contract Amount: $25,260.00
Value of Work Performed: 100%
Date of Completion: 12/24/08

Project: JFTB Los Alamitos – Ramp Asphalt Repair
Owner Representative: Walter Sharp
Contact Phone Number: 562-795-2083
Contract Amount: $10,184.70
Value of Work Performed: 100%
Date of Completion: 2/19/09

Project: JFTB Los Alamitos – Site Work Building Pad for Weapon Vault
Owner Representative: LTC Walter Goodwater
Contact Phone Number: 916-854-3206
Contract Amount: $59,670.00
Value of Work Performed: 100%
Date of Completion: 4/30/09

 

NAVFAC SOUTHWEST

Project: LNAS Shade Structures
Owner Representative: Marlan Snodgrass
Contact Phone Number: 559-998-3580
Contract Amount: $110,900.00
Value of Work Performed: 100%
Date of Completion: 3/19/08

Project: LNAS EIFS Installation Bldg. 4
Owner Representative: Marlan Snodgrass
Contact Phone Number: 559-998-3580
Contract Amount: $184,300.00
Value of Work Performed: 100%
Date of Completion 04/11/08

Project: LNAS Merge Lane & Bollards
Owner Representative: Jerry Weeks
Contact Phone Number: 559-998-2506
Contract Amount: $455,358.00
Value of Work Performed: 100% Complete to Date
Date of Completion: 5/31/09

 

Project: LNAS Paint Roads
Owner Representative: Al Alvares
Contact Phone Number: 559-998-3844
Contract Amount: $107,410.00
Value of Work Performed: 100%
Date of Completion: 4/30/09

Project: Los Alamitos Forces Training Base - Golf Course Fencing
Owner Representative: David Crawley
Contract Phone Number: 562-626-6157
Contract Amount: $255,489.60
Value of Work Performed: 100%
Date of Completion: 1/28/08

SEQUOIA/KINGS CANYON NATIONAL PARK

Project: Boiler Install
Owner Representative: Fred Picavet
Contract Phone Number: 559-565-3180
Contract Amount: $36,436.42
Value of Work Performed: 100%
Date of Completion: 10/25/2007

 

Project: Fence Installation
Owner Representative: Fred Picavet
Contact Phone Number: 559-565-3180
Contract Amount: $41,375.00
Value of Work Performed: 100%
Date of Completion: 3/07/08
CURRENT PROJECTS

USACE-Sacramento District

Project: Camp Roberts -Upgrade Building Systems Design-Build Buildings 25011, 25021, and 25026
Owner Representative:
Contact Phone Number:
Contract Amount: $2,994,611.00
Value of Work Performed: 20%
Date of Completion:

NAVFAC-Southweast

Project: LNAS Roof Repair & Gutter/Downspout Replacement
Owner Representative: Kevin Kessler
Contact Phone Number: 559-998-4104
Contract Amount: $590,025.00
Value of Work Performed: 75%
Date of Completion:

Project: LNAS Paving Various Locations
Owner Representative: Jim Corbett
Contact Phone Number: 559-998-2590
Contract Amount: $1,191,419.00
Value of Work Performed: 10%
Date of Completion:

Project: LNAS Paint Film Floor Coating Aircraft Maintenance Facilities Bldg. 210, 175 & 176
Owner Representative:
Contact Phone Number:
Contract Amount: $75,105.00
Value of Work Performed: 2%
Date of Completion:

Project: LNAS Extend Road Shoulder At Pass & Decal and Gateway Road Locations
Owner Representative:
Contact Phone Number:
Contract Amount: $216,130.00
Value of Work Performed: 2%
Date of Completion:

USACE – Los Angeles District

Project: Edwards AFB Repair FSD Various Building Owner Representative: Michael Diaz
Contact Phone Number:
Contract Amount: $1,963,394.00
Value of Work Performed: 2%
Date of Completion

Project: Edwards AFB Repair HVAC Building #2660
Owner Representative: Michael Diaz
Contact Phone Number:
Contract Amount: $921,532.00
Value of Work Performed: 4%
Date of Completion

Project: Los Alamitos Storage Building
Owner Representative: Stan Fujimoto
Contact Phone Number: 626-401-4084
Contract Amount: $635,999.00
Value of Work Performed: 99%
Date of Completion

BUREAU OF RECLAMATION

Project: Folsom Dam, Safety of Dams Modifications, Dike 4 & 6 Embankments
Owner Representative:
Contact Phone Number:
Contract Amount: $2,088,902.00
Value of Work Performed: 30%
Date of Completion